1st place
Christophe Faurie
Vinci
Bordeaux, France

Design of the MECA building (Business and Culture Centre) in Southern France. Two concrete piles are supporting an eccentric steel bridge. Building faces are made of 800m² concrete panels. Elastic supports were introduced to match the actual structure behavior. A seismical analysis was warried out as the project is located in a zone 2 seismical area.
The building is also equipped with staircase tower, that allows access to the roof of the highest building.
User benefits: